Moving along...

Last weekend I installed the coaxial cable runs for the bedrooms and great room, ran about 90% of the pex water supply lines, and 1/2 of the wall insulation. Saturday night I was so caught up in the insulation mess, I worked until 3:00 am Sunday morning. Tim (Hulk Hogan) finished the drain plumbing with the hope to complete the pressure test this week.

R13 kraft faced insulation in the exterior facing walls

Pex manifold and supply lines in progress

Unfortunately, I ran out of blue 1/2 pex tubing or I would have finished the job on Sunday. Working with pex is without question the easiest way to install water supply lines. I was able to finish 90% of the rough-in work in 3-4 hrs with no previous plumbing experience at all! Of course, this is all dry fitting, since I have no water supply to test yet. Hopefully, I can post the photos of the final product (all strapped up) in a few weeks!