Wednesday, August 1, 2012

More family, less construction

Just got back from a great long weekend with the family up on the island. We visited the Carnival, enjoyed a nice boat ride (thanks John), and played in the pool at the Venture Resort. Bonnie decided to take the family up to Put-In-Bay for the day on Wednesday.

Bonnie and the girls at the Carnival

Me and my boy on cousin John's new boat

The whole family on the boat enjoying the day

Sophie just "sitting on the dock of the bay"

Mom and Bonnie with coconut drinks (their new favorite thing) back at the Cedar Cottage

The whole crew at Papa T's famous ice cream downtown KI

Bonnie at Put-In-Bay

Anna at Put-In-Bay

Although this trip was dedicated to the family, we were able to get the plumbing drains started (thanks Tim, a.k.a. "Hulk Hogan"). Here is the bulk of the pvc fittings. I also brought up ~200 ft of pvc pipe in various diameters. The plan is to have the drain plumbing rough-in completed by the end of next weekend.

Mess of pvc fittings

I am heading back up to Kelleys on Friday to start more work on the whole house electrical and hopefully wrap-up the drain plumbing.

No comments:

Post a Comment