We were able to open up Cedar Cottage and all mechanicals worked as expected the weekend of Mar 30th - Apr 1st. The mild winter certainly helped as nothing seemed to be damaged as a result of freezing or excessive water exposure. I was able to make progress on the Lower Cliff property by draining the three-foot-deep foundation pond down to less than 1/4 inch of wet mud using 2 pumps for ~12 hours. Heading back up to continue site work on Friday, Apr 13th. See ya on the rock!
Pipe contraption that I hooked up to move water from the foundation pond
Water down > 12" since starting the pump(s)
Next morning, looking much drier!