Gravel delivery and back-fill

This weekend I worked on cleaning up the lot from the huge mess left behind from the framing in preparation for the back-fill and rough grading. Saturday (June 9th) morning, we had 21 tons of gravel delivered. The plan was to use 1/2 for the back-fill and the other 1/2 for the driveway. Well, it turns out that we used ~approx 20 tons on just the back-fill! So not much left for the driveway at all! The good news is that we did have enough dirt to complete the rough grade. This sounds funny but dirt is a rare commodity on Kelleys Island.

Gravel delivery - big truck but not as much material as you think

 Captain Ron (KI neighbor) working on the back fill with his favorite toy, "The Skid Steer"

This is a view of the completed back-fill from the back of the cottage.
Ron did a great job and was done in about 3 hours.

My amazing wife ran in the annual KI 5k race, in the blazing heat...
with ALL THREE KIDS on Sunday, June 10th