Sunday, March 29, 2020

City water

This weekend was all about getting the well pump fixed for Lower Cliff and getting city water connected and finishing all open plumbing for Southaven in preparation for drywall.

Thankfully, Chris was able to help me get the new well pump installed on Lower Cliff. So now water is working as expected.

MILESTONE ACHIEVED!!!

Okay, the photos below look like a muddy hole with some pex and a connection. However, this is the city water hookup from the street. Big thanks to Tim for helping out.

I am so friggin' happy we now have city water on tap! (No hauling water and no well pump.) Just clean pressurized water on tap!



Bonus item: we installed the upstairs corner shower

Upstairs shower base and walls