This weekend we rented a massive trencher (Ditch Witch) to dig all the infrastructure runs for:
- Electric (3 inch conduit)
- Water (3/4 direct burial PEX)
- Septic (3 inch PVC)
- Gutter (4 inch drain)
We finished tasks 1-3. The gutter drains will be deferred until 2020.
 |
Water line |
 |
Tim - Ditch King |
No comments:
Post a Comment