Tuesday, July 15, 2014

Dudes only weekend

My old friends Brad and Rob came up for the weekend. We definitely had more fun than getting much work done. One nice accomplishment was that I picked up the new custom built table (and matching benches) by Bob and set it up in the kitchen/dining area.

 New table and benches

We ordered a custom made addess sign that is shaped like Kelleys Island and actually made from recycled aluminum cans. There are many of these similar address signs up and down Division street. After waiting for weeks, Bonnie picked it up on Friday... extremely happy with the results. You can see from the "205" photo below, the background brown color and silver accent color is friggin' perfect!

205 Lower Cliff - New address sign

The big task for the weekend was too FINALLY finish-off the catch basin. You can see the final product and driveway in the photo on the right. This was a tricky little project. No clear solution to properly fix this mess. After looking at this problem for 4 years, I am happy with the results. The deck top has nice clean horizontal lines that actually extend the rectangle shape of the green electrical tranformer. Anyway, we are still thinking about what we could place on top of this open deck, like a large planter or maybe just nothing - more to come...

 Catch basin progress - from fresh block work to finished wood deck top 

Another big task was the extension and reshaping of the driveway. Huge thanks to Chris and Tim Arnold for extending the drive by making it wider on both sides but also for making it shorter to give us more usable yard. They used the Bobcat to lay down some rock screenings as a base for the fresh extended sides, then gravel on top and then freshly graded with more gravel from front-to-back. Looks awesome. Big thanks and shout-out - Chris and Tim!

Fun weekend with my buddies. We hit the town Friday and Saturday and did some damage.

The next photo is just for a little comic relief. Brad and me decided to go get some water with "Big Red" and fill up a tank load. For some reason, I didn't secure the middle hose line properly and then proceeded to launch the water. Thankfully, no one else was around or they would have laughed at us...

Water truck fiasco

I also finally purchased the vinyl plank flooring for the entire cottage. The plan is to take up 1/2 on Friday, July 25 and the other 1/2 the next Friday. Apparently, the load is so heavy that my truck can't handle it all on one pallet.

Next steps:
  • Paint
  • Start on the flooring

Thursday, July 10, 2014

4th of July

Long weekend with the family up on the island. After attending the Arnold's 4th of July party, we caught the last ferry (Friday night) at midnight! Bonnie and me had both vehicles loaded up with the kids and tons of stuff. Now ready for the long weekend...

Me and my boy

I really wanted to do something different for the master bedroom headboard "feature" wall. I considered: painting (too easy), grass cloth (too expensive), pallet wood (too trendy). Anyway, I decided on a nice wood treatment using thin tongue-n-groove pine planking. I found a cool inexpensive product from Lowe's that I used for the installation. You can see the progress and finished wall below.

 Horizontal planked pine "feature wall" in the master bedroom

Yes, the painting continues. With the entire family at the cottage, I really couldn't get too much painting done because of the large mess. However, I was able to trim Anna's room along the corners and ceiling with the first coat. We chose a pale light green as the next selection in the beach palette for the entire cottage. So far, so good, every color looks cohesive with the rest of the other colors. This is a good thing.

Anna's room trimmed

LOOKING AHEAD

We are slowly, but steadily, approaching the final design phase of this cottage project. I can't wait to finally get to the fun part where we get to furnish, decorate, accessorize, etc. Bonnie and me have been thinking, planning, measuring, buying and waiting for this for years! Much more to come in future posts.

Next steps:
  • More painting
  • Build out a small deck to top the catch-basin
  • Buy the flooring

Tuesday, July 1, 2014

Solo - "Rockin' the Rock"

Not much exciting to report. I spent the entire weekend painting as much as humanly possible. I ended up using about 7 gallons. At any given time, I had 1-3 brushes and 1-2 rollers with alternating paint cans/colors open. Plus, I kept the drywall mud flying as well. I would mud over any spots that I needed to fix and try to sand them before or between coats of paint. Big fun. Big mess.

After getting a late start on Friday, I began painting Neil's room and finished around midnight. Here is a photo, although the room really looks much better onsite live.

Neil's room painted
 
Friday night, I was determined to keep rolling. I worked into the wee hours of Saturday morning up until about 3:30 am working on assembling Neil's new bunk bed. I can't wait for the little guy to finally have a real bed in the cottage. He will love it! 

Neil's new bunk bed

Saturday morning, I got a late start because I needed to catch-up on some sleep lost staying up late the night before. Next on the list was our master bedroom. This is the largest bedroom, but had the least amount of drywall/mud fixing needed. Again, not the most exciting photo, but it looks great live.

Master bed room painted
 
Saturday night, I was thoroughly sick of painting and I needed to leave the premises of the "work camp" to get some fresh scenery. I took Chris's golf cart downtown to check-out the music festival underway. After some good live cover tunes, a few Dortmunders and a pile of fresh hummus, it was time to head home. Not too much fun really at a music festival by yourself. Although, I will be looking forward to attending this next year (with some family and friends) because the vibe was very cool.
 
 1st Annual Rockin' the Rock

Sunday morning, although semi-disgusted with the thought of more painting... I had to push forward and crank out Sophie's room. Sophie's room was next on the "to-do" list. Here are some before and after photos.

 Sophie's room photos - trimmed and then finished

I wanted to get the trim and rolling done around the kitchen counter tops because they needed to be oiled up again with butcher block treatment. So after painting the walls (very carefully) and removing the blue tape I layed on a heavy coat of the the butcher block oil/wax. This protects the surface and makes the counter tops look much richer and brings out the natural wood grain, etc.

Most recent kitchen photo
 
The painted rooms do not come across that great in theses photos. However, this was a nice chunk of painting that that I was able to finish over the weekend. Unfortunately, I need about 1 & 1/2 more similar weekends to finish up.

Projects completed:
  • Neil's room painted - done
  • Neil's bunk bed assembled and mattresses set-up - done
  • Sophies room painted - done
  • Master bed room painted 90%
  • Main room painted 25%
  • Kitchen counter tops oiled up again
Next steps:
  • More painting
Looking forward to this weekend for a long Fourth of July weekend with the family.

Thursday, June 26, 2014

Father's day >> Vacation >> Anniversary

Bonnie, Sophie and lil Neil all went up to the island on Thursday, June 12 for an extended Father's Day weekend. Anna and me joined them on Friday the 13th! The rest of the family (Jill, Bob, Judy, Amie, Scott, Owen and Jackson) came up Saturday to celebrate Father's Day early (actual holiday was on Sunday). We really had a nice time and it was awesome to be able to spend time at the new cottage as an extended family.

Of course, Anna and Sophie talked me into going downtown for ice cream as soon as possible. Here is a photo of them at their favorite ice cream joint - Papa T's.

My baby girls
 
Bonnie packed up the kid crew and headed home late on Sunday. I took the week off for vacation with plans to stay alone on the island and work on the cottage. Bonnie (by herself) came back up on Thursday, for an extended anniversary weekend.
 
Happy 16th year anniversary to my girl!
 
We had a wonderful time doing the island old-school: chillin' down by the lake shore, boat watching and much fine dining.
Bonnie and me - happy anniversary!

We spent some time hanging out with John, Amy and Ethan Pyke who came up to Kelleys on their boat for the weekend.

The cottage progress continues...

One huge outstanding site issue was the catch-basin that is located directly next to the electrical transformer at the street. You can see from the first photo below, this is a friggin' mess and not properly installed by any stretch. This "hole" is where all the rain water, gutter run off and sump-pump termination flows to before eventually draining under the street, along George's property line and then to the quarry.

This is a huge pile-of-crap that needed to be cleaned out periodically because dirt was washed into the hole whenever it rained. When we bought the property (in 2010), the seller promised that this would be fixed and now 4 years later it was still a problem...

Before and during the block work to seal in the catch basin

Fortunately, Chris was having his new foundation built by the same crew who laid our block foundation back in 2012. As part of their job, Chris had these guys seal in the catch-basin with fresh block. Nice.

Catch basin block-work finished

Another nice addition was the installation of the microwave. Every new appliance makes the cottage more-and-more livable. Check-it out in the working kitchen photo below.

Microwave installed

BIG HASSLE ALERT:

One big job that took much much longer than anticipated was the finishing of the skylights. No joke, this probably took me 15-20 hrs over three days. The skylight cavities were drywalled and mudded. They needed to be 1) sanded, 2) re-mudded, 3) re-sanded, 4) tapped, 5) primed, 6) painted, 7) trimmed, 8) trim painted and then 9) final trimmed. The real trick was trying to work inside a 13 inch cavity with the sun shining in your eyes in 100+ deg heat. There was no easy way to get inside these narrow cavities while standing on a 15 ft ladder. Plus it was a pain-in-the-azz slapping paint inside them without painting yourself in the process.

My plan is to not touch these again for a long while, hopefully never. The photo below does not do this effort justice. However, I am extremely pleased with the finished product. You really need to see the trimmed-out skylights live to appreciate.

Skylights primed, painted and trimmed

I  also finished priming and painting the main bathroom. Again, this photo does not make the small room look all that great. The wall color is a sweet medium gray. Uber cool.

Main bathroom - painting complete
 
The entire cottage still needs painting other than the aforementioned main bathroom. I did start the kitchen/main room 1st coat. The color choice is awesome. Cool, light gray. Funny - because you can't really tell what the actual color will look like until you get it on the wall. And of course, it was a non-returnable custom color that was humped to the island all the way from Home Depot.

 Kitchen/mainroom paint started

Yes I did, I have spent 10 consecutive days on the island. I was seriously expecting to get more done between June 13th and 22nd, but I was happy with the results.

Projects completed:
  • All remaining closet organizers installed - done
  • Chalkboard wall framed - done
  • Main bath painted - done
  • Microwave installed - done
  • Skylights - done (huge job)
Next steps:
  • Finish drywall remediation
  • Paint, paint, paint


Monday, June 2, 2014

Sophie weekend

Sophie came along with me for the weekend since Bonnie and Anna had to go to Michigan for Anna's school field trip on Friday. Sophie hung out with Christina from next door the entire weekend. I let her eat (or not eat) whatever she wanted for three days, for real. Little Sophie is a trooper and was fun to hang out with...

To kick-off my island trips, I literally bring a "truckload" of stuff and this weekend was no different. Earlier Friday, I stopped by Sears to pick-up the new Electric range and refrigerator. We backed the truck up to the front door so we could slide the appliances from the tailgate into the cottage. Good work.

Back it up to the door
 
Every weekend, I try to make as much progress as physically possible. But having a full size working fridge is a real nice milestone.
 
New refrigerator - friggin' sweet

Friday night I started on the attic access doors. I already had the doors built but I needed to hang some hinges on them and make them work in the attic doorway space. Hinges are quirky and a little unforgiving. You have to screw them in perfectly level or the doors won't swing open or close as expected. Plus once you start drilling the hinge holes, you can't undrill or move them. Anyway, I got the hinges mounted to swing to the inside, very minimal and functional. The next morning, I cut the trim and installed a simple barrel bolt from the inside to keep the left door in place.

Attic access door work-in-progress and finished product

Saturday, after finishing up the attic access doors, I started on the cottage sign installation. Bob had made the sign for us a few seasons ago, but I wanted to wait until I had the lot in good enough shape to finally make it permanent. As usual, this took longer than expected

First, I didn't have long enough 4x4 posts. Luckily, Chris has an extra post that he had to track down that someone actually borrowed and didn't use - weird. Next, I had to dig the holes and set the posts in quickcrete. As you may recall, my least favorite thing is digging holes especially in rock hard soil that is 50% stone filled (Sheesh). Tricky part was to determine the natural height and position of the posts to be in harmony with the size of the sign and the cottage. Last, I cut the top piece and mounted the sign. The whole project took 1/2 the day but the results look awesome!

"Our House" cottage sign and Sophie
 
On Sunday, I finished painting the chalkboard wall and then primed - the bar nook, utility room, remaining kitchen and other missing touch-up throughout. 
 
Next steps...
  • Trim-out the chalkboard wall
  • Install the closet organizers for both Sophie and Neil's room
  • Start the drywall remediation that has been exposed by the priming
  • Paint the main bathroom

Wednesday, May 28, 2014

Memorial Day

Big fun family weekend! We have been waiting a long time to use the new cottage with the whole gang and the good news is that it worked out fine. The weather was absolutely beautiful everyday. Despite having no doors, limited lighting, no floors and the entire cottage covered in drywall dust, we had a great time.

The lil' patriot

On Memorial Day, Monday - May 26th, we attended the service at the cemetery with about 300-400 other islanders. All of the veterans were dressed in full uniform along with several active duty military, coast guard, police, etc. The service was very moving and made you think about the sacrifice of these great men and women that makes our country what it is today.

After the memorial service chilling at the VFW

Before the Memorial day festivities...

I had Friday off from work so I made it up on Thursday night (After my mandatory trip to Menard's to pick up more stuff). I lugged our old grill from home and set-up a nice little base camp.

 Backyard base camp
 
While I was cleaning up all of the construction materials/mess in preparation for the family's arrival on Friday, I found a bunch of ceiling scrap wood that was already clear coat stained. So, late night on Thursday, I framed out the attic access doors. I need to decide how to hinge and trim these. Anyway, this is a good start...  

Attic door access work-in-progress

Friday morning, I primed all of the closets, Neil's room and the rest of the main room. Bon and the kids were coming up Friday, early evening, so I got a chance to knock-out as much priming as possible in about 8 hours. I also installed 2 closet organizers in the Anna's room and the master bedroom.

Saturday, Captain Ron stopped over with his Skid steer to spread the gravel around the driveway. It looks great and you can really see the driveway now. I still need another dump truck load of gravel to finish it off, but it looks awesome for now.

Driveway gravel spread by Captain Ron
 
Later on Saturday, I taped off and started the chalkboard wall. Surprisingly, one pint of paint would only allow for one coat, so I'll have to wait until next weekend to finish. This does look pretty cool and will be a fun casual addition to the cottage.

  Chalkboard wall work-in-progress

My mom Jill (Nama) joined us to spend some island time with family on Sunday. We had a nice day that started with a long lakeside lunch at the Brewery, hung out with the crazy "hood" neighbors and then took a walk down the State Park pier.

Anna and Nama on the pier

Bonnie - former "Hula-hoop champion"

Now that the driveway is finally taking shape, I wanted to cover the exposed swale drain that goes under the driveway. The reason was to gain about 4 more feet of usable yard space and just make the drain opening look nicer and more functional. This photo does really do this justice, but it covered up the ugly exposed bright green pipe and should allow for better drainage. It's the little things...
 
Driveway swale drain

Other boring maintenance included cleaning out the front gutter because heavy rain would just pour over the side. Should work as expected now and help dry out better around the cottage.

Next steps:
  • Install the cottage "Our House" sign
  • Finish chalkboard wall
  • Finish up the attic access doors
  • Keep priming

Monday, May 19, 2014

Family time

Bonnie and 'lil Neil made the trip up on Thursday night to get all settled in. I brought the girls up later on Friday when they got home from school. Anna brought her friend Gabby along for the weekend. After stopping at Burger King, Menards and gas station we made it on the 6:30 pm ferry.

The girls on the ferry

This was the first trip up this year for the kids (and Bonnie) so they were super excited. The weather Fri/Sat was chilly and rainy but we made the best of it. Sunday was beautiful and sunny.

Neil playing with rocks on the beach

Saturday morning, while Bonnie took all the kids on the extended island activity tour, I got cracking on the kitchen sink install. Since the countertop was 1 1/2 inch butcher block, the standard sink mounting clips were too short. So, early last week, I special ordered the "long clips". When I go to pick them up at Menards, they give me more of the standard short clips. Something got goofed with the special order and now I'm stuck. Anyway, I now had two sets of short sink clips and I was determined to make it work.

After playing around with these crappy clips, I was able to get the sink secured in place. Next was too hook-up the plumbing, which was particularly tricky because I had to install an Air Admittance Valve that acts as a vent for drains that do not have access to a standard wall vent. Then I hooked up the p-trap to the sink drain and installed the Moen fixture - this was a breeze. After crimping on the PEX connectors and hooking-up the supply lines, I tightened all plumbing connections. Time for a test run... Amazing, no leaks.

A working kitchen sink is a huge milestone. In my opinion, this is second in importance only behind having a working toilet.

Kitchen sink, done!

With all of the work done over the last 4 weeks, I really wanted to show Bonnie her new kitchen. Needless to say, she's a "happy girl".

Bonnie in her new kitchen

Here is the latest photo of the bar nook with the countertop, trim and cabinet hardware installed. This is cool little area for bar supplies, etc.

Bar nook - work in progress

Earlier in the week, Chris and Tim (big thanks!) hauled a load of gravel for us. We probably will still need 1-2 more loads, but the driveway should be done then.

Gravel for the driveway

Had a very nice weekend with the family and still got a lot of work done.

Next steps...
  • Prime, prime and prime
  • Start painting the great room?
  • Install closet organizers and shelves for master closet and Anna's closet