Monday, June 10, 2013

Family weekend

Just spent the weekend with the family up on the island for the first time this season. I still managed to get a ton of work done around the cottage, but I spent more quality time with the family. Also, the neighbors were in full effect having multiple gatherings every night and usually with a camp fire.

On Saturday afternoon, the Arnold's took Sophie fishing with them and their daughter Christina, her new best friend.
Sophie and Christina - fishing

By end of day Saturday, I was able to run 4 cold air returns and finish the bathroom sun tunnels (had to cut-into the new drywall ceilings). The sun tunnels are great source of natural light for both bathrooms.

Sophie and Christina took full advantage of the construction site and built a tent from drywall scraps, very creative little girls.

Sophie in her drywall tent


Bonnie and Anna ran in the Annual Kelleys Island 5k on Sunday. I heard that 900 runners participated this year. Matt and Adrianne Bailey made it up for the run as well.

Anna, Bon, Addrianne and Matt ready for the race
 
Missing the island already. Bonnie and the kids stayed all week. I will be joining them this weekend!

Tuesday, May 21, 2013

8 guys and 90 sheets of drywall

What a whirlwind man. I've been planning drywall weekend for many months, but I could not be any happier with the results.

The weather was nice, clear and warm but very windy. I heard the ferry was rocking something fierce. The crew began arriving late on Friday (May 17th) afternoon. As different groups of dudes began to show-up, the madness ensued.

After checking out the new cottage and hanging a few sheets, it was time to head to the Cedar Cottage for pre-partying and then hit the bars. Friday night turned into a blur, fun had by all.

Bright and early Saturday (May 18th) morning, we started around 8:00 am.

Meet Albert, the King of all things drywall. If you can measure it, cut it and screw it, Albert is your guy. He runs a tight ship.

Albert, the Foreman
 
Uncle Al, gets to take a break from long weekends of HVAC. Enjoying his new role as Drywall Co-captain and Ambassador of fun.
 
Uncle Al, Drywall Co-captain

Using 12 foot sheets makes the process a whole lot faster. I can't believe I actually considered only using vertical 8 footers for the whole cottage - bad idea. Here is a photo of the first bedroom done. Look at the ceiling, nice.

Anna's bedroom
 
Second bedroom done. The place is starting to look like a cottage. This will be lil' Neil's bedroom.

Lil' Neil's bedroom

Meet the Hasek brothers, Gary and Kenny. Or as Brad calls them, Kenny Gary/Gary Kenny. He couldn't remember their real names all weekend. These guys know a thing or two about hanging drywall and drinking beer. Gary is one hell of a guitar player as well. Kenny briefly lost his wallet on Sunday morning to later be surprised it was in his duffle bag all along. Good news man.

Gary and Kenny, the "Drywall Brothers"
 
The Hasek brothers working on the master bedroom
 
We wrapped up Saturday at around 5:00pm. Thanks to Brad and Andy for making food. Time to get our party on. We started out at the Caddy Shack and closed out the night at Bag the Moon as far as I can tell.
 
Sunday morning was a little tougher to get started. I think Albert was back at it around 9:00 am. We started to lose crew members as the morning rolled on. Albert, Al, Scott and me kept at it until around 1:00 pm. Here are some photos of the weekend results.
 
Looking at the kitchen area
  
Scott helped out working on finishing up drywalling the closets
 
 This is one of the last photos of the weekend, late day on Sunday. I was beat...
 
Looking towards the front of the cottage from the dining area

We were able to get an amazing amount of work done. The cottage really took shape this weekend. All of the rooms are now clearly defined and the spaces feel great. I have a few walls to finish hanging and of course the taping and mudding, but overall the majority of the drywall is hung!

The crew that deserves to be recognized by name:
  • Albert Hobar
  • Al Stenger
  • Gary Hasek
  • Ken Hasek
  • Andy Stenger
  • Scott Kanengeiser
  • Brad Sale
I am honored to have you as my friends and family. Thank you so much for your help. I seriously could not have done this without all of you. Bonnie and me appreciate and love you beyond words!

Next step. Take a break for a few weeks and try to save cash.

Back at ya soon...

Monday, May 20, 2013

Lowes and Bayside Comfort

I got to the island late on Thursday (May 16th) night to get the cottage prepared for the drywall delivery (from Lowes) and the A/C compressor charge (from Bayside Comfort) both happening first thing Friday (May 17th) morning.

It turned out both guys were on the 8:00 am ferry, so I met them at the dock to follow me back to the cottage to get rolling.

Lowes flatbed truck delivery, the ferry buster!
 
Lowes unloading
 
90 sheets of drywall, thanks for good weather
 
Bayside Comfort finishing up the A/C Compressor

A/C is now working blowing cold. Bayside installer did mention that I will need to add a few cold air returns that are currently missing from the install to properly feed the air handler. Not sure when I will get this done, but I will add it to the list.

Next steps... drywall!


Monday, May 6, 2013

A/C Compressor

Quick work weekend up on the island. I made it up late Friday and worked on the ceiling registers and flexible ducts for all the rooms. Uncle Al came up Saturday morning to finish up running the line-set for the A/C compressor, helped me with the cold-air returns, and finished the plumbing for the air handler.

I build a stand for the A/C compressor from 2x6s and 4x4 posts to keep the unit level and elevated properly. Al stubbed out the line-set and wired up all the electrical.

Uncle Al admiring his fine work

It was Derby weekend and the weather was beautiful. However, we both left on the 8:30pm ferry on Saturday night. The ferry was packed with all-day party'ers and it was tough to leave, but we wanted to have Sunday to spend with the family since we have put in so many long weekends so far this Spring.

I'm heading up again next weekend, probably just for the day, to insulate the main duct trunk lines and clean-up the cottage in preparation for the long awaited drywall weekend.

Monday, April 22, 2013

We have heat!

The lake was rough, super windy and there were the typical dock rumors about cancelling ferry service. However, Uncle Al made it up for another HVAC work weekend. The plan was to rock-out the remaining duct work, wire-up the furnace, and maybe get the heat rolling before leaving on Sunday.

Bonnie and Lori came up Saturday for some fun times and provided a much needed break from crawling around in the rafters for 3 out of the last 6 weekends.

Al and I wrapped up at about 5:00 pm on Saturday to spend some time with the ladies. After cleaning up and pre-partying back at the Cedar Cottage, we headed to the Winery. We were planning to see the band all day, and when we arrived, they were 1/2 through their last song, funny. Bring on the vino...

Al, Lori, me and Bon at the Winery
 
Needing to eat some dinner, we made our way to the old and faithful, Village Pump. Still relatively early in the season, but the Pump was jammin' at the bar.
 

Me and Bon at the Village Pump
 
As we started to lose track of time, we wandered next door to the Captain's Corner for a night cap.
 
Al and Lori at Captain's Corner

Despite all of the fun, we did manage to get quite a bit of work done. The main duct runs are done, capped off and we started cutting 6-inch rounds into the trunk lines for supply and cold air returns.

Nice transition piece! not too shabby...

Supply duct tied into unit

 
Some time around 3:00 pm on Sunday, Al finished wiring, installed the digital thermostat and we turned on the heat! When the weather has been 45 deg or below, this is a major accomplishment!

Next steps... run the flexible duct supply lines for the rest of the bedrooms and main living area

Monday, April 15, 2013

Working for the weekend

It's Monday morning and yes, I am already planning for the KI weekend activities. Al and I are heading up again to continue work on the HVAC, tankless hot water heater, miscellaneous electrical, and the water tank decking.

We have invited the ladies to join us on Saturday. Should be a nice change to spend some quality island time and not quite so much work.

Need to figure out how to get ~80 sheets of drywall delivered to the island for May 17th. I was thinking about using the Lowes Spring delivery special, but they are not giving me a solid delivery price.

Tuesday, April 9, 2013

Toilet dreams

OK, this may sound funny to anyone who is not familiar with Kelleys Island living and the process of building a cottage from vacant land, but yes, we were able to FINALLY get a working toilet installed sometime around noon on Saturday, April 6th! To the cottage building process, this is as important as the invention of the wheel for advancement of humankind.

Everyone (including myself) takes for granted that working toilets are always available everywhere. Let me just mention all of the dependencies to make a toilet flush on Kelleys Island...
  1. Water - enormous (1800 gallon) concrete water tank - manually filled via truck
  2. Pump - well pump with proper plumbing from water tank
  3. Plumbing - supply lines to (3/4") and from (1/2") PEX manifold and drains (PVC) installed
  4. Toilet - easy peasy
  5. Septic tank - drain lines tied into septic tank  
All of the above have to be "leak-free" with multiple connection points that make me crazy. Anyway, we are good-to-go so far as the toilet goes.

Uncle Al was able to join me for the weekend and he brought his dog "Maddie", the newest member of the crew, on her maiden voyage to the island. Maddie was a good girl and hung around the construction site, in-and-out, of the cottage all weekend.

Maddie, the "Island Dog"
 
We were able to make great progress on the tankless water heater intall. Next working weekend the plan is to actually have hot water!
 
Uncle Al working on the electric for the tankless water heater

The "eco smart" tankless water heater mounted and all wired up!

I got rolling on the water tank beautification project by hanging vertical decking around the perimeter of the concrete structure. Others have used different techniques. However, I thought the finished look of the decking made a nice clean impact on something that you can't hide smack in your front yard!

Friday, just getting started

Almost done, view from the street
 
All done, view from the house, notice the custom/crafty access ladder 
 
Big Al brought out the Big Ladder and mounted the electrical box for the outdoor spotlights. Can't wait to be able to light-up the yard at night.
 
 Al working on the spotlights