Sunday, October 5, 2025

Front walk-way

Back in 2024, we had a large flagstone walkway installed in the front and a small one installed in the back. After almost two years of trying to maintain them, I was not happy at all with their form or function. I really wanted zero maintenance concrete!

Luckily we ended-up with a beautiful weekend in October to get it done...  

Day 1 - excavation

End of day 1 - ready for forming

Day 2 - forming

Day 2 - pouring

Day 2 - edged

Day 3 - I cleaned up the mess and hand back-filled everything. The finished results are looking great! 


I just need to plant some grass seed, fix the flower bed side and re-wire the remaining landscape lights.